BDP-1 Manufacturing Lead Time

0 Members and 1 Guest are viewing this topic. Read 2146 times.

c_note

  • Jr. Member
  • Posts: 55
BDP-1 Manufacturing Lead Time
« on: 26 Aug 2011, 02:28 pm »
Hi, James.  I think I read that the BDP-1s have been back-ordered since introduction.  After placing a BDP-1 order with a dealer, approximately how long would it take to be fulfilled?  Thanks in advance!

James Tanner

  • Facilitator
  • Posts: 20864
  • The Demo is Everything!
    • http://www.bryston.com
Re: BDP-1 Manufacturing Lead Time
« Reply #1 on: 26 Aug 2011, 02:32 pm »
Hi, James.  I think I read that the BDP-1s have been back-ordered since introduction.  After placing a BDP-1 order with a dealer, approximately how long would it take to be fulfilled?  Thanks in advance!

Hi,

Usually 10 days to two weeks depending on colour and size.

james

Alpha10

Re: BDP-1 Manufacturing Lead Time
« Reply #2 on: 26 Aug 2011, 06:36 pm »
Hi,

Usually 10 days to two weeks depending on colour and size.

james

Assuming you are not overseas (from Canada), takes longer to get to the UK say  :duh:

Cheers

terrycym

Re: BDP-1 Manufacturing Lead Time
« Reply #3 on: 31 Aug 2011, 06:50 pm »
Hi,

Usually 10 days to two weeks depending on colour and size.

james

Size?
I thought they're all the same size?

James Tanner

  • Facilitator
  • Posts: 20864
  • The Demo is Everything!
    • http://www.bryston.com
Re: BDP-1 Manufacturing Lead Time
« Reply #4 on: 31 Aug 2011, 06:52 pm »
Size?
I thought they're all the same size?

No.... as with most things they are bigger on this side of the pond. :lol:

james

Alpha10

Re: BDP-1 Manufacturing Lead Time
« Reply #5 on: 31 Aug 2011, 06:58 pm »
No.... as with most things they are bigger on this side of the pond. :lol:

james

National debt?  :oops:

terrycym

Re: BDP-1 Manufacturing Lead Time
« Reply #6 on: 1 Sep 2011, 09:12 am »

c_note

  • Jr. Member
  • Posts: 55
Re: BDP-1 Manufacturing Lead Time
« Reply #7 on: 2 Sep 2011, 02:29 pm »
Just to confirm, what options do you specify when placing an order?  I'm assuming they are:

1) Size (17" or 19");
2) Face plate color (silver or black); and
3) Display color (green or blue letters)

Is this correct?  Anything else?

Thx in advance!

James Tanner

  • Facilitator
  • Posts: 20864
  • The Demo is Everything!
    • http://www.bryston.com
Re: BDP-1 Manufacturing Lead Time
« Reply #8 on: 2 Sep 2011, 02:30 pm »
Just to confirm, what options do you specify when placing an order?  I'm assuming they are:

1) Size (17" or 19");
2) Face plate color (silver or black); and
3) Display color (green or blue letters)

Is this correct?  Anything else?

Thx in advance!

Hi c_note

If the display is blue then the led lights will also be blue.

james


mr_bill

Re: BDP-1 Manufacturing Lead Time
« Reply #9 on: 2 Sep 2011, 07:28 pm »
James,
You can request either green or blue display on the BDP-1?  If so, that is nice.
Is that also available on the BDA-1?

James Tanner

  • Facilitator
  • Posts: 20864
  • The Demo is Everything!
    • http://www.bryston.com
Re: BDP-1 Manufacturing Lead Time
« Reply #10 on: 2 Sep 2011, 07:29 pm »
James,
You can request either green or blue display on the BDP-1?  If so, that is nice.
Is that also available on the BDA-1?

Yes available on both.

james