I am just setting up my 9B and 4B SST² amps. They're "replacing" similar ST series amps. My question is regarding the remote power-up sequence, which is a different method than the STs.
Do I take it that this will be the sequence: remote voltage from pre-pro triggers 9B on IN. When the 9B has fully finished its soft startup, the trigger voltage will only then appear on 9B OUT. This goes to 4B IN, and will then start up the 4B, and when its fully finished its soft startup, the trigger voltage will appear on 4B OUT. The 4B OUT can then go on to 4B-ST etc. with appropriate time delay settings.
That's how I read it anyway. My main concern right now is the new (4B and 9B) SST² amps have to be plugged into the same 15A circuit (STs are on a different circuit) until I organise things better, so don't want all the amps powering up at once.
This may be moot anyway, as I typically (lightly) use the amps 16+ hours per day. The STs were on 24/7, and I will probably do the same with the SST²s too. But I'd still like to have the remote turn-on properly configured for those periods if/when my usage changes. Thanks.