Thanks for input. As for shielding I could use conduit, pvc, aluminum,steel or copper pipe which would work best ? Changing my ground or grey water location not practical in my situation. When we do an UFA the ground wire is wrapped around the rebar for 30' to 40'. The dealer I bought my fuses from said when asked about cryoing them " while it may seem to give a blacker background, it may also lose some of the harmonics and tonal richness." any comment? What type of ring connecters, standard aluminum or gold plated or ? Should I use the same connections for my d/c power runs for my d/c system. It is a 15' run of 4 #4 cables to a j box with runs of #8 to the equipment from there. I was also going to cryo these and the 2/0 battery interconnects, any reason not to? As far as code goes I find it is often determined by factor other than what is best, like what is cheapest, especially in structural matter, that why when I build I do what is best, which is usually more than what code calls for.
Mike