Soon I will be making phase adjustments to my 4 piece system as I tune it to both the new room and crossover selection. Delays will be needed to allow proper timing between those pieces. I have two ways to do this and I wanted to know the relative pros and cons of each.
First, I could delay the faster section by using a delay made by measurement in ms. The other option is to delay that faster section by selecting a delay in phase. The idea would then be to bring up the formerly slow section up to meet the new delayed one by using it's phase control and measuring.