0 Members and 1 Guest are viewing this topic. Read 7533 times.
The results of a 2 1/2 year DIY room renovation, down to the dirt. Radiant heat tubing in the concrete, ALL wires in the floor or wall, total redundancy built in through conduitThis was a converted 2-car garage and the floor was a wreck. FIVE days just to jackhammer it out, then lower it, level it, put down insulation, rebar, conduit, you name it. Still haven't rebuilt the steps into the kitchen. A little reflective but OH, so sweet!And it also doubles as a photo studio, BTW.EDIT: Forgot to add the TT.