0 Members and 1 Guest are viewing this topic. Read 284383 times.
Paul-Remove the cork blocks and try 4 large Cardas Myrtle blocks under the maple platform. We use the large Cardas block as part of our isolation stands and it does a wonderful job of enhancing midrange and top end detail. They work great under anything heavy.
just installing two Reference One at component IEC (CDP and Integrated amp). I am not sure if it's my illusion or not, but noise level is almost none.Jen, i know PE V/IEC is recommended at the component end, but for now, i would like to take use of what i have. I was wondering if Reference One suppress or open the sound based on your experience. May be someone else can jump in. I wish cable liberator can be a better quality cable or something that i can DIY with my own cable.Thanks
Quote from: michaelv on 25 Jun 2008, 01:03 amjust installing two Reference One at component IEC (CDP and Integrated amp). I am not sure if it's my illusion or not, but noise level is almost none.Jen, i know PE V/IEC is recommended at the component end, but for now, i would like to take use of what i have. I was wondering if Reference One suppress or open the sound based on your experience. May be someone else can jump in. I wish cable liberator can be a better quality cable or something that i can DIY with my own cable.ThanksMichael,Following your experience I replaced 193L at the IEC ends of the tube-pre and amp with 2 Ref One's, with another Ref One at the bottom of a duplex next to the main duplex in the audio circuit. I like what I hear.
Quote from: JenMaher on 27 Jun 2008, 07:37 amPaul-Remove the cork blocks and try 4 large Cardas Myrtle blocks under the maple platform. We use the large Cardas block as part of our isolation stands and it does a wonderful job of enhancing midrange and top end detail. They work great under anything heavy.Thanks Jen. I will try the Cardas Myrtle blocks.
I suggest we wait for another few days because the PE takes a good 10 to 12 days to settle down, better to get the first one settled before trying to install the next one.
Keith-Plug the next PE into the PLC.DONE Keith