I just had mine painted. Not sure when I will get to assembling them. 

Looks great  man   

I've been asked this a couple times so  here's a heads up for others assembling these,   use the gaskets behind the Neo10's,.  The recesses were cut  to accomadate them.  You'll need to trim a little rectangle out of each gasket  to fit around the terminals as there is only  room for a thin strip of the gasket to get by them not the   full gasket width.  I just used  a  razor blade to make 2 little  cuts then  bent the piece up and sliced it off .
Also, use the pre-installed gaskets on the front face of the  GR Neo3's.  finally, don't forget   to install the  yarn/wool in the 2 outer  rows on the front of the  Neo3
Like Tyson  says, a small hole in the top of the sub section right near the  rear of the baffle is great for passing c/o wiring up.  I was going to pre-drillthese for everyone but  wasn't sure  everyone would  want to   go that  route so   we omited them.  I actually  placed mine  right in spot where they come up through the c/o board.
for the Neo10 mounting screws .5 to .625"   will be fine.  I actually  threaded  each  of the  Neo10 mounting  screw holes  (think I used  M4 machine screws) so  I was able to get  some nice  allen / hex drive  screws 
jay