0 Members and 1 Guest are viewing this topic. Read 12664 times.
Wow, sounds like a lot on your plate, especially this time of year. Good luck with everything.--Mike1
It's too much right now, but exciting too. We're getting the radon issue fixed next week. Looks like the shop will be 24x40 instead of 24x32! The work area will be the largest. There will be two smaller rooms, one for painting and one will be a den for listening, testing and showing off equipment. I don't know who's going to come all the way out here to listen, but it will be available.
The latest:I have some work that SHOULD be Finished now, before the shop is present. I am working on delegating fabrication and finish work (painting, etc...) to two local shops. I want this to _continue_ after I am back up and running 100% as well so an inventory can be established and lead times dramatically reduced. It has been extremely difficult orchestrating all steps of manufacturing by myself, especially custom orders. Delnero has always done all my wood work. On the building: It looks as if the foundation will be in place this week. A buried 200 amp service will be installed as well shortly after.