Home
Circles
Gallery
Systems
Calendar
About/Help
Login
Register
Gallery
»
Browse gallery
»
Albums by Voncarlos
»
Room treatment
Gallery
Browse gallery
Random albums
I'm Feeling lucky
Up to Albums by Voncarlos
Room treatment
Stucco J-channel hangers in place
J-channel close-up
Hangers in place, ready to add 2nd layer of 703
Add-on flange close up.
4" panel back side with very shear cover tucked in.
Stucco J-channel brackets painted and ready.
Three 4" panel frames.
6" panel frame laid out to be burlaped.
6" panel corner construction.
Walmart ext. cord, vinyl stripped & double runs.
Walmart ext. cord with Teflon covering.
Added 4th conductor.
«
Prev
| Page 2 |
Next
»
View slideshow