Sorry guys, supply issues and shipping delays are eating us up right now.

0 Members and 1 Guest are viewing this topic. Read 5541 times.

x5472

  • Jr. Member
  • Posts: 8
Sorry if this has been answered before but I cannot search yet.
Just wondering if there is any idea when the NX-Studio's might be available?

Thanks
Paul

Danny Richie

Sorry if this has been answered before but I cannot search yet.
Just wondering if there is any idea when the NX-Studio's might be available?

Thanks
Paul

From Peerless yesterday: As of now ETD for M130 and M165NQ is Feb 12-15 - That’s firm!

Danny Richie

Any updates on Tube Connectors and LGKs?

 :D

thanks

We have more tube connectors being air mailed to us next week.

Following that order is a short run of 1000 units with an ASAP order.

They will then produce the balance of that order with another 1,500 units.

And another 2,500 units following that order just as fast as they can make them.

LGK driver samples are being air mailed over with one of the tube connector orders. They looked really good via their measurements and should be a winner this time.

Hobbsmeerkat

  • Industry Participant
  • Posts: 2542
This is all great news! I cant wait to get started!  :thumb:
Also expect an LGK order from me! :P

Digi-G

Sounds like I better get moving on my NX Studios - I haven't made much progress since I got the flatpack.  I've done a couple of round-over cuts and now I need to get some finishing done / assembly.  Hopefully this weekend.   :thumb:

It would be nice to have the cabinets ready and order the electronics later this month.

x5472

  • Jr. Member
  • Posts: 8
From Peerless yesterday: As of now ETD for M130 and M165NQ is Feb 12-15 - That’s firm!

Great News! :thumb:
Paul

RonP

  • Full Member
  • Posts: 407
updates always appreciated!!

WarmColors

  • Jr. Member
  • Posts: 166
Sounds like I better get moving on my NX Studios - I haven't made much progress since I got the flatpack.  I've done a couple of round-over cuts and now I need to get some finishing done / assembly.  Hopefully this weekend.   :thumb:

It would be nice to have the cabinets ready and order the electronics later this month.

I have not really done much to my cabinets either, just waiting for the drivers to arrive.
Just to give you an idea I am using what I think is a decent system. PS Audio DAC, Odyssey Amp, the new power cord and 16g speaker wire Danny offers, zen audio cables. ALL OF IT IS PAIRED TOOOOOOOO...... Onkyo HT in a box speakers from 20 years ago. Though I will admit these cheap speakers have never sounded so good.

Peregrino

  • Jr. Member
  • Posts: 11
Woohoo!!!
Sounds like I'm finally going to be able to order my AV0'S and the LGK's!

Danny Richie

Woo Hoo, tube connectors and new LGK samples are in route.

DHL tracking number (J) JD01 4600 0085 6092 1786, if you want to follow along.

We have a lot of orders in house right now waiting for tube connectors. They are packed up and ready to go and will go right out the door as soon as the tube connectors get here.

JWCoffman

Woohoo!
I better hurry up and get my cabinets built.

RonP

  • Full Member
  • Posts: 407
Woo Hoo, tube connectors and new LGK samples are in route.

DHL tracking number (J) JD01 4600 0085 6092 1786, if you want to follow along.

We have a lot of orders in house right now waiting for tube connectors. They are packed up and ready to go and will go right out the door as soon as the tube connectors get here.

How did that LGK sample go?


Danny Richie

How did that LGK sample go?

Very good. 2,000 of them are on order.

Hobbsmeerkat

  • Industry Participant
  • Posts: 2542
Very good. 2,000 of them are on order.

That's great news!