I have drawn a line in the sand for myself and I WILL have the mod finished by this Friday, the 14th.
At that time, we will begin scheduling start dates, as we have with the Oppos, with the same arrangement - i.e. 50% deposit to reserve a start date. I already have two units confirmed on the calendar as they are already at the shop and have been for SOME TIME!
I apologize for how long this has taken, but I am only human and have been stretched thing. Thanks to a fabulous team, my production crew is handling the amp and preamp production and Kristin, my Executive Assistant and practically C.O.O., is handling other logistics for me. I have told my team that I am to be sequestered for the first half of everyday, to focus on design details.
The final tube stage design is complete for the mod and in final testing. I expect to have everything dialled in by weeks end.
I appreciate all of your patience!
Sincerely!
Dan W.