Ted B's 2009 remodeled home theater

Edit: New pics half way down, shot Aug and Nov 2009. All Realtraps, Sistrum racks, etc installed. This.gallery is to highlight the March/April 2009 remodeling of the music room/home theater. The remodeling involved: * 8.5" riser built in back third (7.5' x 15.25') of room, to allow for second level of movie seating * sloped walls and ceiling painted flat black for reduction of ambient light during video viewing * walls painted Ralph Lauren Suede (textured) caminos grey color * new carpeting is black, small geometirc pattern, with silver striping * any existing white Realtraps (about 40% of inventory) being replaced by black The painting was completed April 13th and several black Realtraps were re-installed in the ceiling area (formerly occupied by white Realtrap products). The final work (carpeting) was completed April 16. 2009. 2 channel equipment was re-installed that night, and the remaining surround and video equipment will be re-installed over the next several days. new black Realtrap replacements will arrive in the next couple of weeks and be installed in corners (Corner Mondotraps) and ceiling wall junctures (2x2 Minitraps), and RFZ's will be installed on wall stands for previous side wall placement. Skyline type diffusors (or more absorbers) will be ordered for flat ceiling application, and artwork will be returned to the room asap.
Thumbnail for Riser work shown, including cable tunnel - April 1, 2009
Thumbnail for Shows wooden riser in back third of room, before painting started
Thumbnail for back area cleared for riser work
Thumbnail for Carpeting installed today! First section of equipment installed - Mostly 2 channel stuff, plus black Realtraps in ceiling area. No corner traps,side wall RFZ's, artwork, etc yet.
Thumbnail for Rear view of new remodeled work, including riser, carpeting and paint - Walls are darker than they appear here (wall washed with lights)
Rear section is missing video/surround rack, surround speakers (SP Tech Continuums), Alon Centris movie surrounds on side walls, corner Mondotraps, artwork, etc.
Thumbnail for Rear view of new remodeled work, including riser, carpeting and paint - Lighting is distorting the actual colors (RL Suede gray walls), black/w silver striped carpeting.
Thumbnail for Wide view of front soundstage with curtains open - April 2009 remodel includes new carpeting, riser (where pic is taken from), new black ceiling paint and grey wall paint, and new Realtraps additions
Thumbnail for Wide angle view of front row seating and listening area - Sistrum rack on right
Realtrap RFZ's on sides, Corner Mondos in corners (duh!) and MiniTraps on ceiling areas
April 2009 remodeled (new carpeting, 7 new Realtraps added, new black and gray paint scheme, new riser on rear third of room)
Thumbnail for front of soundstage as of 05/06/09, showing with screen drapes open - scene from Transporter showing on projector :)
Thumbnail for front of soundstage as of 05/06/09, showing with screen drapes open - scene from Beatles: Let It be (rooftop concert) showing on projector :)
Thumbnail for front left channel Mundorf ultimate crossover (SP Tech Revelations)
Thumbnail for Diffusors, GIK art panels and Realtrap corner mondos highlighted here
(Prev) | Page 1 | Next »